PKGroom

Help

Production & Quality Policy

Specification approval, golden samples, inspection expectations and non-conformance handling.

No bulk production run commences without signed Golden Sample approval and written technical specification sign-off.

Pre-Production Milestones

  • Golden Sample sign-off (physical reference retention in Korea and client office)
  • Approved Artwork Proofs (Vector AI files with pantone reference numbers)
  • Neck Finish & Dispensing Engine Tolerance Agreement
  • AQL (Acceptable Quality Limit) Standard Level II Agreement

Quality Control Checkpoints

During production, Korean factory quality engineers and PKGroom operators perform rigorous inspections across key parameters:

  • Dimensional & Wall Thickness verification using digital calipers and gauges
  • Vacuum Leakage & Drop Testing for sealed closures and pumps
  • Cross-hatch Tape Adhesion test for printing and spray coatings
  • Pump Engine Dosage Accuracy (ml per stroke) & priming count
  • Color Consistency vs Approved Pantone / Golden Sample (Delta E < 1.0)

Defect Resolution & Non-Conformance

If non-conforming items exceed agreed AQL thresholds, PKGroom coordinates immediate root-cause investigation, factory rework, or remanufacturing at no extra cost to the client.

Explore Verified Packaging